Building wall manual for a house




















Additionally equipment schedules shall identify equipment basic ratings and types. Include references to operation and maintenance procedures if already covered in previous section otherwise include specific preventive, predictive and breakdown maintenance procedures. Troubleshooting procedures and charts shall also be populated in this section.

An index should be provided of all record drawings supplied during the course of the installation work, identified by a number and title. The index should also include a schedule of all drawings supplied by manufacturers and suppliers during the course of the installation work, e. You can download the operation and maintenance manual template in word format by clicking below link:. Interior non-load-bearing walls consist of:. In new-construction houses and additions, complete interior walls are built on the floor, then they are tilted up and fastened into place.

With existing construction, though, it is difficult to tilt a pre-built wall into place. In order to complete the tilt, the wall would need to be shorter than the space it is required to fill. Instead, you will attach the bottom plate to a solid place on the floor.

Next, you will attach the top plate to the ceiling, directly above the bottom plate. Studs will be measured individually, then they will be toe-nailed into place. To complete the wall, drywall will be hung on the studs. The screws and seams will be filled with drywall compound. Even with a non-load-bearing wall, many municipalities require you to apply for a building permit before executing the project. The interior wall needs to be built to building code, with studs spaced every 16 inches on-center.

Check with codes in your area to tailor the wall to community requirements. The bottom 8-foot-long two-by-four must be fastened to a solid spot on the floor.

If the floor is concrete, the concrete is considered solid enough for a bottom plate. If the floor is wood wood joists below a floor covering , the wall should be placed either directly on a parallel joist or perpendicular 90 degrees to the floor joists.

You can do this by measuring the joist locations in your basement or crawl space and then transferring the measurements to the floor inside. Put the top and bottom plates next to each other on the floor. Use a short scrap piece of two-by-four to mark a stud position at each end.

Next, mark five positions between those two outside marks. These five marks should be 16 inches apart, on-center. Use the Speed Square to transfer the marks from one plate to the other plate. For a concrete floor, fasten the bottom plate, which should be a pressure-treated 2-by-4, to the floor with concrete nails using a powder-actuated nail gun.

For wood floor systems, attach the bottom plate to the floor with a hammer and nails. Drive the nails by hand directly through the two-by-four, then the floor covering, and into the joist. The lumber for this application does not need to be pressure treated. The top plate must be directly above the bottom plate.

It must be connected across perpendicular ceiling joists or directly on one joist. Use the laser level plumb function to ensure that the top plate is directly above the bottom plate. I want this this type plan…calculate the quantity of items work using standard measurement sheets load bearing residential structure using description of items from DSR 1bhk plan with staircase. Thank you for your building estimator. Its really very helpful to understand estimate.

I have different query — I got detailed drawing for construction of house but could not able to estimate using your estimator as i am not very well versed with terminology. Do you give paid service to give me detail estimation such as how much exact concrete required, steel required, other things such as masonry bricks, plastering , plubming, electricity etc.

This will help me to decide whether to go with only labor or give to builder? Sir, Thanks for such a great information. But I want to have some knowledge about footings, columns, beams and slab. Can I have specific knowledge from your site? Sir can you tell that by which method it is done longwall and shortwall method or center line method sir…. Hello sir Your article is very helpful to understand building estimation but sir how steel ,labour charges and foam work include in estimation please reply sir or send me explanation of above three mention things.

Your email address will not be published. Item Description No. Footing 1m x 1m 11 1. Base 1m x 1m 11 1. Column 11 0. Deduction Footing P. Footing R. Footing Column 0. Deduction L-1 -3 L-2 -4 3. L-3 -3 4. L-4 -1 1. L-5 -1 2. Beam mm x mm L-1 3 L-2 4 3. L-3 3 4. L-4 1 1.

L-5 1 2. Plinth area out to out 1 Deduction Column 0. Shot wall-1 3 3. Shot wall-1 1 3. Shot Wall-2 3 4. Window W -2 2. Window W1 -2 1. Window W2 -3 1. Window W3 -1 1. Door o -2 1. Door D -1 1. Door D1 -1 1. Door MS -1 2. Vent -1 0. Vent V1 -1 0. Passage wall 1 2. Deduction Door D2 -2 0. Parapet Wall Long Wall 2 Shot Wall 2 7. Shot wall 2 3. Deduction Door D1 Window W2 Window W3 Shot wall 2 4.